Solar Savings Plan

MSpectrum installs solar in your home

You use solar energy to power your home

Billed by Meralco for top-up electricity

Billed by MSpectrum at a lower rate



Solar Subscription Plan

MSpectrum installs solar in your home

You use solar energy to power your home

Billed by Meralco for top-up electricity

Fixed Subscription funded by bill savings



Have you chosen a Solar Home Plan?
Take the Next StepMSpectrum Solar Savings Plan — Promo Mechanics
3rd Floor, Business Solutions Center, Meralco Comp. Ugong, Pasig City 1604
May 14, 2026 – June 30, 2026. Customers must sign the contract on or before June 30, 2026 to qualify.
- Active Meralco account in good credit standing (paid at least 7 bills last year before actual disconnection)
- Complete documentary requirements submitted
- Passed MSpectrum's technical and site feasibility assessment
- Years 1–3: Meralco blended rate less ₱3.00/kWh for the first 36 months
- Succeeding years: Meralco blended rate less ₱2.00/kWh
- Price floor: Minimum of ₱11.50/kWh applies at all times
- No upfront payment (DU Less arrangement)
- MSpectrum retains ownership, operation, and maintenance
- Customer pays based on actual kWh generation
- Minimum system size of 5 kW, subject to right-sizing
- Perpetual contract; early termination fees apply before Year 10
- Consumes at least ~800 kWh/month
- Can utilize ≥80% of solar generation
- Has daytime electricity usage and occupies the home year-round
- Site inspection, feasibility study, system design and engineering
- Supply and installation of solar PV system
- Distribution Impact Study (DIS)
- Net Metering enrollment; Peak/Off-Peak (POP) enrollment (encouraged)
- Permits (Electrical Permit, CFEI, COC) — value capped at ₱25,000
- Testing and commissioning; preventive and corrective maintenance
- Monitoring system and monthly reports; insurance coverage
- Submit inquiry via official channels
- Provide documents (Meralco bill, proof of ownership, valid ID)
- Undergo site assessment and proposal
- Sign contract within the Promo Period
- Proceed with installation and energization
- Year 1: actual generation × promo rate; Year 2 onwards: actual generation × standard rate
- Payment via Auto Debit Arrangement (ADA) or approved channels; monthly digital billing
- Security deposit equivalent to two (2) months' estimated billing
Projected savings are estimates only and may vary due to consumption behavior, weather, system performance, site conditions, and regulatory changes.
- System remains property of MSpectrum
- Contract is non-transferable without approval
The MSpectrum Difference
Discover how our commitment to provide our customers with world-class service sets us apart
Compare your Plans
| Feature | Savings Plan | Subscription Plan |
|---|---|---|
| No Upfront Cost | ✓ | ✓ |
| Ideal for | 800kWh and above (₱12,000 average monthly bill) |
600kWh (₱9,000 average monthly bill) |
| Expected Monthly Payment | ₱2/kWh LESS than Meralco Rate | Fixed monthly payment for your solar system |
| FREE Operations and Maintenance (with Unlimited repairs and replacement) |
✓ | ✓ |
| FREE Net-Metering processing and permitting |
✓ | ✓ |
| FREE end-to-end Installation | ✓ | ✓ |
| Premium Aftersales Support | ✓ | ✓ |




